<s id="0s4et"></s>

    1. 中国女人大白屁股ass,一 级 黄 色 片免费网站 ,国产福利萌白酱在线观看视频,国产精品亚洲а∨无码播放麻豆 ,国产三级精品三级,国产互换人妻XXXXXX6,亚洲中文字幕无码久久精品1,一进一出抽搐gif
      Position: 首頁 < Home < News < Company News

      Kexu Tianshan Waste Heat Power Generation Project connected to grid

      PublishDate:2024-04-02 Source:


        Recently, Kexu Tianshan Waste Heat Power Generation Project, general contracted by Sinoma Energy Conservation, was successfully connected to the grid. The project is located in the heavy industrial park of Atushi City, Xinjiang. The scope of the project includes the design of the waste heat power generation, the supply of equipment and the commissioning of the waste heat power generation system, and the contract was signed on July 26, 2023, the clock started on August 6 of the same year, and the unit was connected to the grid on April 2, 2024, which was completed.

        

        After the signing of the project, in order to ensure the power generation on schedule, the project department carefully planned the work arrangement of each stage. In the pre-project preparation stage, the project department actively coordinates with various departments to complete the basic design and procurement work in time; in the installation and commissioning stage, all the members of the project department overcome all the difficulties and stick to the construction site, which ensures that the project will reach the project nodes according to the contract as scheduled.

         

        After the project is connected to the grid, it is expected that the daily power generation will reach more than 216,000kwh, which has good economic, environmental and social benefits.

        


      ?